The central guide construction in WARR lines in operation was completed.
You can drive the physical type train in the distances between the Neumoegen station and the Electra station today.
WARR既開業線のセンターガイド工事が完了しました。
今日からNeumoegen駅からElectra駅の間で物理型列車を走らせることができます。
The speed-up of the point operation and the sensitivity improvement of the signal sensor were done at the same time.
In addition, the overbridge (Sandhill Sage overbridge) to the Electra station west was opened, too.
同時にポイント動作の高速化と信号センサーの感度向上も行いました。
さらにElectra駅西方にある跨道橋(Sandhill Sage 跨道橋)も開通しました。
Apr 14, 2011
Apr 11, 2011
WARR Today :: Installation of central guide
I am constructing a central guide of the Burns station today.
Construction has already been completed to the station west.
The guide construction was completed in yesterday in the section from the Neumogen station to the Takatsudo station.
The physical type train can run in the section from the SLRR line to the Burns station by this.
今日はBurns駅のセンターガイド工事をしています。
既に駅西方まで工事は完了しました。
昨日までのうちにNeumogen駅からBurns駅までの区間はガイド工事が完了していましたので、これでSLRR線からBurns駅まで物理型列車が走れます。
The part that enclosed with a green circle is still under construction.
It will be completed tomorrow.
緑色の円で囲んだ部分はまだ工事中です。
明日には完成するでしょう。
Construction has already been completed to the station west.
The guide construction was completed in yesterday in the section from the Neumogen station to the Takatsudo station.
The physical type train can run in the section from the SLRR line to the Burns station by this.
今日はBurns駅のセンターガイド工事をしています。
既に駅西方まで工事は完了しました。
昨日までのうちにNeumogen駅からBurns駅までの区間はガイド工事が完了していましたので、これでSLRR線からBurns駅まで物理型列車が走れます。
The part that enclosed with a green circle is still under construction.
It will be completed tomorrow.
緑色の円で囲んだ部分はまだ工事中です。
明日には完成するでしょう。
Apr 9, 2011
WARR Today :: Lida and Important News
The tracklaying of the Lida station ended.
There is no signal yet. However, the train came to be able to run.
Lida駅の線路工事が終わりました。
まだ信号がありませんが、列車を走らせることができるようになりました。
An important news is here.
I have laid tracks up to now without central guides of the WARR line.
However, I am laying tracks with central guides now because there were a lot of voices of being using the physical type train.
I will install a central guide about the route that has already opened.
Mr. Jer Straaf's wonderful trains will be able also to run in the WARR line when the construction might be completed.
ここで重要なお知らせがあります。
これまでWARR線はセンターガイドなしで線路の建設を進めてきました。
しかし物理型列車を利用したいという多くの声があったので、今はセンターガイドありで建設を進めています。
既に開通した路線についても今後センターガイド工事を進めていくつもりです。
これまでJer Straaf氏の素晴らしい列車をここで走らせることができませんでしたが、工事が完了すれば走らせられるようになります。
There is no signal yet. However, the train came to be able to run.
Lida駅の線路工事が終わりました。
まだ信号がありませんが、列車を走らせることができるようになりました。
An important news is here.
I have laid tracks up to now without central guides of the WARR line.
However, I am laying tracks with central guides now because there were a lot of voices of being using the physical type train.
I will install a central guide about the route that has already opened.
Mr. Jer Straaf's wonderful trains will be able also to run in the WARR line when the construction might be completed.
ここで重要なお知らせがあります。
これまでWARR線はセンターガイドなしで線路の建設を進めてきました。
しかし物理型列車を利用したいという多くの声があったので、今はセンターガイドありで建設を進めています。
既に開通した路線についても今後センターガイド工事を進めていくつもりです。
これまでJer Straaf氏の素晴らしい列車をここで走らせることができませんでしたが、工事が完了すれば走らせられるようになります。
Apr 8, 2011
WARR Today :: Lida Station
The construction of the Lida station still continues.
Installation of the railway track is completed now, and it is advanced to installation of switches.
The construction of the station building doesn't advance at all.
現在は線路の設置を完了し、ポイントの設置に進んでいます。
駅舎の建設は遅々として進みません。
Mar 13, 2011
I AM SAFE.
The earthquake of M8.9 occurred in northeast Japan at 2:46PM, March 11 at Japan standard time.
Because I lived in West Japan, did not receive immediate damage.
However, 10,000 people or more are still missing now in the stricken area.
Help has gathered from all over the world to the stricken area now.
I as one Japanese, wish to express my gratitude to you all over the world who rescues.
Because I lived in West Japan, did not receive immediate damage.
However, 10,000 people or more are still missing now in the stricken area.
Help has gathered from all over the world to the stricken area now.
I as one Japanese, wish to express my gratitude to you all over the world who rescues.
Mar 5, 2011
WARR Today :: Construction of Slosser Station
The construction of the Slosser station was started.
I am in haste doing work here because I was able still to acquire the station schedule ground though it is under construction of the Lida station.
It is a small station has one platform and one line without the siding railway.
It is a station in the WARR line where it doesn't only face the public road.
Slosser駅の建設が始まりました。
まだLida駅を建設中ですが、駅予定地を取得できましたので、急遽こちらの作業を行っています。
ポイントを持たない1面1線の小さな駅です。
WARR線の中では今のところ唯一公道に面していない駅です。
The position of the Slosser station was different from present though it had existed most in the first plan.
Slosser駅はもっとも最初の構想では存在していましたが、その位置は現在とは違っていました。
The Slosser station disappeared from the plan when becoming an actual plan stage. However, the distance between the stations in this section has opened because the Electra station was constructed instead of the Grote station.
実際の計画段階となったときに、Slosser駅は計画から消えましたが、今回Grote駅の代わりにElectra駅が建設されたことから、この区間の駅間距離が開いてしまいました。
The Slosser station would be constructed with such details.
このような経緯でSlosser駅は建設されることになりました。
I am in haste doing work here because I was able still to acquire the station schedule ground though it is under construction of the Lida station.
It is a small station has one platform and one line without the siding railway.
It is a station in the WARR line where it doesn't only face the public road.
Slosser駅の建設が始まりました。
まだLida駅を建設中ですが、駅予定地を取得できましたので、急遽こちらの作業を行っています。
ポイントを持たない1面1線の小さな駅です。
WARR線の中では今のところ唯一公道に面していない駅です。
The position of the Slosser station was different from present though it had existed most in the first plan.
Slosser駅はもっとも最初の構想では存在していましたが、その位置は現在とは違っていました。
The Slosser station disappeared from the plan when becoming an actual plan stage. However, the distance between the stations in this section has opened because the Electra station was constructed instead of the Grote station.
実際の計画段階となったときに、Slosser駅は計画から消えましたが、今回Grote駅の代わりにElectra駅が建設されたことから、この区間の駅間距離が開いてしまいました。
The Slosser station would be constructed with such details.
このような経緯でSlosser駅は建設されることになりました。
Mar 1, 2011
WARR部分開通式御礼
ご参加いただきました方々へ
本日はWARRの部分開通式に多くご参集いただきまして本当にありがとうございました。
拙い進行でしたが、大勢のご来客の方々から本当に暖かいお言葉をいただき、全線開通までがんばろうと決意を新たにしているところです。
これからもWARRをよろしくお願いいたします。
ありがとうございました。
WARR オーナー
Hilto Meridoc
----------------
Dear Participants,
Thank you really for participating in the opening ceremony of WARR for today.
I was able to get a warm word from a lot of ceremony participants. I will make an effort further to carry out the whole line opening to traffic of WARR.
Please expect the development of WARR.
Thank you very much.
WARR Owner
Hilto Meridoc
本日はWARRの部分開通式に多くご参集いただきまして本当にありがとうございました。
拙い進行でしたが、大勢のご来客の方々から本当に暖かいお言葉をいただき、全線開通までがんばろうと決意を新たにしているところです。
これからもWARRをよろしくお願いいたします。
ありがとうございました。
WARR オーナー
Hilto Meridoc
----------------
Dear Participants,
Thank you really for participating in the opening ceremony of WARR for today.
I was able to get a warm word from a lot of ceremony participants. I will make an effort further to carry out the whole line opening to traffic of WARR.
Please expect the development of WARR.
Thank you very much.
WARR Owner
Hilto Meridoc
Subscribe to:
Posts (Atom)







