Oct 26, 2013

Schedule of the WARR closedown

It is displayed in SLTime on all date and time.

November 1 0:00: WARR closedown work start.

November 1:
From 0:00 to 1:00: Closedown of all RezZone.
From 1:00 to 3:00: Removal of all signals.
From 3:00 to 5:00: Removal of the Burns Station.

November 2:
From 1:00: Removal of all catenaries(overhead wires) and masts.
From 4:00: Removal of all tracks and switches.

Removal of tracks will take a few days.

November 3:
Removal of tracks.

November 4:
Removal of tracks.
Removal of viaducts and bridges.

November 5:
Removal of viaducts and bridges.

November 6:
Removal of stations.
Rearranging of the land parcel.

November 7:
Rearranging of the land parcel.

November 8:
9:00 AM :Abandonment of the land parcel.

The end of the WARR closedown work.

- - - - - - - - -
以下日本時間によるスケジュールです

11月1日午後4時:WARR閉鎖作業開始

11月1日:
午後4時~午後5時:REZゾーンを閉鎖
午後5時~午後7時:信号機撤去
午後7時~午後9時:Burns駅撤去

11月2日:
午後5時:架線と架線柱の撤去
午後8時~:線路とポイントの撤去

線路の撤去は数日かかる見込み。

11月3日(朝から)
線路の撤去

11月4日(朝から)
線路の撤去
高架橋と橋の撤去

11月5日(夕方から夜)
高架橋と橋の撤去

11月6日(夕方から)
駅撤去
土地区割りの整理

11月7日(夕方から)
土地区割りの整理

11月8日
予備日

11月9日
午前2時:土地放棄

WARR撤去作業終了。