WARR Today :: Construction of Grote Station

I am continuously constructing the Grote station.
The platform and the stairs were almost completed.
I will construct the station building in the future.
However, I use this space as a station because there is a wide space under elevated.
There are two stairs because the home divided into two by the inbound-outbound line, too.
Because this place became full only by displaying the railway track, it was not able to be done though I wanted to install the home between railway tracks in reality.
The stairs end by one if the platform is one, too.
In addition, the accompanied construction of roof of the stairs is sure to have decreased considerably, too.

引き続き Grote 駅を建設しています。

It became huger than I thought.


In the plan, everything is scheduled to be stepped over in elevated of 10m in height in the place that intersects with the road.
Because the next was road in this place soon, it was necessary to build the station on elevated by all means.
The installation of the guide was difficult on the road though I had thought crossing on the road like the double-track line.


The road is a rapid inclination of the desire.
It is a situation that is easier than stepping over the road in elevated makes the railroad crossing.


Nov 29, 2010

WARR Today :: Slosser elevated bridge and Grote Station

I acquired the vast land in the Slosser region.
The place that the railway track passed in this region was almost fixed by this land acquisition.
A temporary putting of an elevated bridge department material was done, and I confirmed the line type, and divided land.


On the other hand, construction began in land in the Grote region that had been acquired before.
Surrounding land cannot be acquired yet.
Then, the station is constructed with the purpose of obtaining the knowhow of the elevated station construction that will be needed in the future.
I want to have them quickly draw the railway track to this Grote station in the real intention.


Grote temporary station where half of station is actually laid in the next Electra region.
There is only here in the position of the station because there are a castle and a river in the west here soon.

Nov 27, 2010

West Atoll RailRoad

Two weeks have already passed since I begin to have made West Atoll RailRoad.
However, the railway track has not been postponed from the Burns station built first at all.
Land necessary for scheduling the railway track to be extended was able to be bought considerably these two weeks.
However, many of these lands has not been connected yet.
Therefore, I cannot lay railways yet.

The Burns station was almost completed by the favor.
I am very glad there to be a person who comes to see the station sometimes.

West Atoll Rail Road を造り始めてから早2週間がたちました。