Apr 14, 2011

WARR Today :: Central guides was installed on existing railway

The central guide construction in WARR lines in operation was completed.
You can drive the physical type train in the distances between the Neumoegen station and the Electra station today.


The speed-up of the point operation and the sensitivity improvement of the signal sensor were done at the same time.
In addition, the overbridge (Sandhill Sage overbridge) to the Electra station west was opened, too.

さらにElectra駅西方にある跨道橋(Sandhill Sage 跨道橋)も開通しました。

No comments:

Post a Comment