Feb 6, 2011

WARR Today :: Development of railway signal system

The opening to traffic of a new line is late.
The purpose is to develop a new railway signal system.
It will become a system that the train doesn't encounter mutually in the single-track territory though it cannot be so complex.


I will manage driving the train by using this system in the section from the Burns station to the west. The SLRR method is used from the Burns station in the east up to now.


A new system is aiming at the system that can run a train like not the simple one only that the switch is switched like the SLRR method but a true railway according to the signal. I try to bring it close to it as much as possible though I do not think that I can perfectly control the train of course.


No comments:

Post a Comment